3. Make sure a minimum 50 cm

clearance is provided
between the blade tips and
any obstructions. Refer to
Figure 2.

4. Mark and centre-punch two

positions diametrically opposite,
at 90

°

to the pipe seam, 20mm

from top of the tube (Refer to
Figure 3). Then drill two 10.5mm
diameter holes.





E.3 Wire

If the cross section area of the wires is NOT sufficient, the wires will heat

up and could create a fire hazard. Please choose the right size of wire.

Minimum Wire Size (X-Section Area):

Distance From Batteries to Turbine 0-9M

9-18M

18-27M

27-45M

Wire X-Section Area for
12V Wind Turbine

4mm

2

12AWG

6mm

2

10AWG

8 mm

2

9AWG

10mm

2

8AWG

Wire X-Section Area for
24V Wind Turbine

2.5mm

2

14AWG

4mm

2

12AWG

6mm

2

10AWG

8mm

2

8AWG

F. Installation

F.1 Please follow these precautions during the installation:

1. THINK SAFETY! Have someone available to help when installing.
2. Disconnect batteries from turbine.

3.

Be careful not to pinch the wires when attaching the turbine to
pole.


F.2 Step-By-Step Instructions


F.2.1 Connect the wires and mount the turbine

1. Run the 2 wires from the battery location, through the pole to the

top of the pole. DO NOT connect the wires to the battery until
everything else has been completed. Strip the insulation back
from each side of wires. Mark both ends of the wires with tape to
identify the polarity: Red = Positive (+); Blue = Negative (-)

Figure 2: Blade and pole clearance

Figure 4: Typical Mounting

Figure 3: Mounting Pole Preparation

Advertising