Reporting, Vis report – Chemtronics VIS 400-HDP Fiber Inspection Scope User Manual

Page 16

Advertising
background image

Optical Design Manufacturing VIS Image Manager Software Manual

Page 16

v1.3.6

Reporting

IMS permits the user to create reports. Two types of reports are provided, VIS Report and Site
Loss Report. The VIS Report information includes fiber endface image(s) and power meter
measurements for the selected test. The Site Loss Report information includes all the tests for the
folder selected and displayed at the bottom of the IMS screen, Figures 19 and 20 illustrate these
reports.

Loss measurement pass/fail limits can be set and enabled by clicking Settings > Power Meter
Pass/Fail Settings on the menu bar. Figure 18 illustrated this window. If enabled and the power
meter measurement exceeds the set limit the measurement is marked as Fail on the reports.

On the top header portion of the reports there is a space a company name. This can be changed
by clicking Settings/Set Company Header before creating a report.

Figure 18: Pass/Fail Settings Screen

VIS Report

Clicking on the VIS Report button will display results similar to the figure below. To display
the results you must first select one or two images in the image list before clicking VIS
Report
. (Hint: Hold Shift or Ctrl key while clicking for two images.)

Advertising
This manual is related to the following products: