5. installing work clamp, 6. installing gas supply – Craftsman 117.205710 User Manual

Page 10

Advertising
background image

OM-194 199 Page 7

2-5.

Installing Work Clamp

1

Work Cable

2

Boot

Slide boot onto work cable. Route
cable out front panel opening from
inside.

3

Negative (–) Output Terminal

Connect cable to terminal and
cover connection with boot.

4

Hardware

5

Work Clamp

Route cable through clamp handle
and secure as shown.

Close door.

ST-801 566-A

1/2, 3/4 in

1

2

3

4

5

Tools Needed:

2-6.

Installing Gas Supply

ST-801 571 / ST-802 028

Obtain gas cylinder and chain to
running gear, wall, or other station-
ary support so cylinder cannot fall
and break off valve.

1

Cap

2

Cylinder Valve

Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.

3

Cylinder

4

Regulator/Flowmeter

Install so face is vertical.

5

Regulator/Flowmeter Gas
Hose Connection

6

Welding Power Source Gas
Hose Connection

Connect customer supplied gas
hose between regulator/flowmeter
gas hose connection, and fitting on
rear of welding power source.

7

Flow Adjust

Typical flow rate is 20 cfh (cubic feet
per hour). Check wire manufactur-
er’s recommended flow rate.

8

CO

2

Adapter (Customer Sup-

plied)

9

O-Ring (Customer Supplied)

Install adapter with O-ring between
regulator/flowmeter and CO

2

cylinder.

6

5/8, 1-1/8 in

Tools Needed:

CO

2

Gas

8

9

3

1

2

4

5

7

1

2

3

Argon Gas

OR

Advertising