8 setting up and filling the heating bath, 9 quick check, Important – BUCHI Rotavapo R-100 User Manual

Page 26

Advertising
background image

5 | Installation

BÜCHI Labortechnik AG

26/60

Operation Manual Rotavapor® R­100

5.8

Setting up and filling the heating bath

1

2

u

Locate the heating bath (1) in the L­shaped cut­out in the Rotavapor base (2).

IMPORTANT

Risk of heating bath corrosion due to use of unsuitable heating fluid

u

Do not use pure distilled water or de­ionised water.

u

If pure distilled or de­ionised water has to be used, add 1 to 2 g of Borax (Na

2

B

4

O

7

x 10 H

2

O) per litre of water.

The recommended fluid for use in the heating bath is water. Normal tap water may be
mixed with distilled water with a mixing ratio of up to 1:1 according to the water hard­
ness.

u

Fill the heating bath with suitable fluid.

5.9

Quick check

u

To complete the installation process, check the following points:

u

Switch on the rotary drive unit, change the rotation speed and check that the evap­
orating flask rotates at a different speed.

u

CAUTION! Risk of skin burns. Make sure that the heating bath is filled, switch on
the heating bath and check that the heating fluid heats up (Chapter 6.1.1 "Prepar­
ing the heating bath", page 27
).

u

Check that the height of the rotary drive unit can be adjusted (see Chapter 6.1.5
"Vertical adjustment", page 30).

Advertising