Checkline BL2 User Manual

Page 3

Advertising
background image

© Electromatic Equipment Co., Inc.

-3-

2.0

MEASURING PROCEDURE BL2 WOOD CHIPS PROBE



1. For a correct measurement please ensure that the device has the same

temperature than the wood chips (+/-3°C). For that reason, let your humimeter
BL2 adjust to the surrounding temperature of the material for at least half an
hour before measuring.


2. Switch on the device: Press the key for three

seconds.




3. Plug the probe of your BL2 wood chips probe straight

into the wood chips. It is not allowed to load the
measuring head incorrect or drop it down!





4. Plug in the sensor cable into the socket of the BL2. Take

care of the correct position and fix it with the knurled nut.




5. Change the calibration curve: Press one time the

key

and then the

or

key. The name of the calibration

curve can be seen at the head of the display.


6. Now the display shows the water content. Left hand

the temperature is displayed.


7. To save the results in the save menu press the

(

button). The storage was successful when the

number in front of the symbol

increased. To reach the

store menu please press

until the

appears.


8. To name the saved results press the

button.


9. Remove the BL2 probe straight with caution and clean the measuring head.

Risk of injury by measuring head!
Keep away from children!

Advertising