5 | electrical connection, 0,5 mm – GEA Bock HG22e A User Manual

Page 19

Advertising
background image

D
GB
F
E

19

96192-11.2014-DGbFE

5 | Electrical connection

5.6 External connection of the MP 10 for terminal boxes at reduced height (Accessories)

Terminal box

PTC1

PTC2

1

2

3

4

3

4

PE

R2

X3:

Fig. 23

0,5 mm²

The compressor and the trigger unit MP10 are operational when the H3 LED (green) illuminates.

5.7 Function test of the trigger unit MP 10

Item

Procedure

LED H1 LED H2 LED H3

red

red

green

1

Power supply interrupted (L1 or S1)

OFF

OFF

OFF

Release the motor temperature sensor connection (1 or 2)

Release the hot gas temperature sensor (if installed) (3 or 4)

2

Restore the power supply (L1 or S1)

ON

Function check of motor temperature sensor: operational

ON

Function check of hot gas temperature sensor: operational

ON

3

Power supply interrupted again (L1 or S1)

OFF

OFF

OFF

Reconnect terminals 1 or 2 and/or 3 or 4

4

Restore the power supply (L1 or S1):

OFF

OFF

ON

MP 10 is operational again

Before start-up, troubleshooting or making changes to the control power circuit,
check the functionality of the trigger unit:

Advertising