Hangar 9 Piper Pawnee 40 ARF User Manual

Page 28

Advertising
background image

28

Required Parts

• Fuselage assembly

• Servo w/hardware (2)

• Receiver

• Receiver battery

• Switch harness

• Foam rubber

• Y-harness (2)

• Hook and loop strap

• Nylon clevis (3)

• Clevis retainer (3)

• Snap link (2)
• 5/32-inch wheel collar (2)
• 32-inch (813mm) pushrod
• 31

1

/

4

-inch (794mm) pushrod

• 32

1

/

2

-inch (825mm) pushrod

• 3mm x 8mm machine screw (2)

Required Tools and Adhesives

• Pin drill

• Thin CA

• Phillips screwdriver: #1, #2
• 30-minute epoxy
• Drill bit: 1/16-inch (1.5mm)

o

Step 1

Position the rudder servo into the radio tray. Transfer the

locations for the servo mounting screws onto the radio

tray using a pencil.

o

Step 2

Drill four holes for the servo mounting screws using a

pin drill and 1/16-inch (1.5mm) drill bit.

o

Step 3

Apply 2–3 drops of thin CA into each of the holes to

harden the surrounding wood. This will make the screws

more secure and prevent them from vibrating loose.

Section 5: Radio Installation

Advertising