OPERATION AND INSTALLATION MANUAL

Page 21

Step 6.

Align the Load Cell bolt thru holes with
the threaded base plate bolt holes.

Step 7.

Screw the two Load Cell Bolts into the
base plate until they are finger tight only.

Step 8.

The height (B) dimension, 2.36”, is the
minimum required service area above the
load cell baseplate to remove the load cell
bolts.

FIG. 24: B DIMENSION

Step 9.

Use a torque wrench and tighten the bolt
farthest from the cable end first. Then
tighten the bolt nearest the cable end.
Torque to 18.44 foot pounds (25Nm).

Step 10.

Inspect the Stainless Plate for scratches or
damage. If there are scratches or damage:

• Use a box end wrench and remove the

two hex machine screws that fasten the
stainless plate to the top plate.

• Discard the old stainless plate.
• Place the stainless plate so that the thru

holes are aligned with the threaded holes
in the top plate.

• Use a box end wrench and replace the

two hex machine screws.

• Lower the vessel down onto the load

points.

• Reinstall the ground strap and anti-lift

off device. (See Fig. 23)