9 ac electrical power wiring – AERCO BMK 1000 User Manual

Page 24

Advertising
background image

Benchmark 750/1000 Boiler Installation, Operation & Maintenance Manual

CHAPTER 2 – INSTALLATION

Page 24 of 192

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913

OMM-0082_0J

05/21/2014

Ph.: 800-526-0288

GF-130

Figure2-7: Manual Gas Shut-Off Valve and Gas Regulator Locations

2.9 AC ELECTRICAL POWER WIRING

The AERCO Benchmark Electrical Power Wiring Guide, GF-2060, must be consulted prior to
connecting any AC power wiring to the unit. External AC power connections are made to the
unit inside the Power Box. Remove the front panel to access the Power Box, which is mounted
in the upper right corner of the unit as shown in Figure 2-8. Open the hinged cover of the Power
Box to access the AC terminal block connections, and other internal components shown in
Error! Reference source not found. 2-9.

Figure2-8: Power Box With Closed Cover

POWER BOX

WITH HINGED

FRONT COVER

FRONT UPPER-RIGHT CORNER OF UNIT

1” MANUAL

SHUTOFF

VALVE

GAS PRESSURE

REGULATOR

DIRT TRAP

GAS INLET

NOTE

It is the responsibility of the customer to
source and purchase the appropriate gas
regulator as described above. However,
AERCO offers for sale an appropriate
regulator, which may be ordered at the time
of unit purchase or separately. Contact
AERCO for more information.

Advertising
This manual is related to the following products: