Chapter 2 – installation – AERCO SmartPlate User Manual

Page 18

Advertising
background image

SmartPlate Installation, Operation & Maintenance Manual

CHAPTER 2 – INSTALLATION

Page 18 of 138

AERCO International, Inc.

 100 Oritani Dr.  Blauvelt, NY 10913

OMM-0069_0E

PRI: 11/26/2013

Phone: 800-526-0288

SP-100

INTERIOR BOTTOM SURFACE

REAR

TB-2

GND

LINE

NEUTRAL

GND

INSTALL EXTERNAL POWER

WIRING THROUGH THIS

CUT-OUT

WHIT

E

TO

TRANSFORMER

BLAC

K

OR

A

N

G

E

220/24 VAC

120/24 VAC

101

GN

D

POWER

SWITCH

10

0

10

2

10

2

100

F

FROM

FUSE

FOR 220 VAC, WIRE #100

MUST BE CONNECTED

TO THIS TERMINAL

Figure 2-6. ECS/SP Control Box AC Power Connections

7. If the ECS was ordered with the Modbus Communication Option, proceed to step 8.

However, if this option is not included, no further steps are required for the SmartPlate. If no
further connections are required, resecure the hinged swing-down panel of the Control Box
and close the front panel door.

NOTE

Step 8 applies ONLY to SmartPlate Control Systems which
include a Temperature Controller (Eurotherm, Model 2408)
equipped with a Communications Board which allows connection
to Modbus Networks. The required signal connections will depend
on the ports available on the Energy Management System (EMS),
Building Automation System (BAS), or Computer being used with
the ECS/SP.