AERCO SmartPlate User Manual

Page 60

Advertising
background image

SmartPlate Installation, Operation & Maintenance Manual

CHAPTER 8 – CORRECTIVE MAINTENANCE

Page 60 of 138

AERCO International, Inc.

 100 Oritani Dr.  Blauvelt, NY 10913

OMM-0069_0E

PRI: 11/26/2013

Phone: 800-526-0288

SP-100

8.4 SINGLE-WALL HEAT EXCHANGER REPLACEMENT

The Heat Exchanger used in each SmartPlate Single-Wall Model is removed and replaced
using the following basic procedure:

1. Turn OFF the POWER Switch on the side of the ECS/SP Control Box.

2. Close all four of the Isolation Ball Valves (Figure 8-1).

3. Connect a hose to the Strainer on the Boiler Water side of the piping assembly (Figure 8-

2). Open the valve on the Strainer and drain the boiler water from the Heater. It will be
necessary to loosen a Victaulic coupling by the Heat Exchanger to allow air into the pipe
during draining.

4. Next, connect a hose the Drain Valve on the DHW Side of the piping assembly. Remove

the 1/4” plug on the side of the Strainer to allow air into the pipe during draining.

Figure 8-2. Draining the SmartPlate Water Heater

5. After the boiler water and domestic water have been drained from the Heater, proceed to

step 6 to remove the installed Heat Exchanger.

6. Replace the 1/4” plug removed in step 4.

7. Using a ratchet wrench with an extension and a 3/4” deep socket, loosen, but do not

remove, the four (4) Victaulic couplings (Figure 8--3). Two (2) couplings are located on the
Domestic Water Side (Figure 8-3) and two (2) are located on the Boiler Water Side.

Advertising