BASO VLV49A Series User Manual

Page 10

Advertising
background image

10 VLV49A Series Universal Replacement Gas Valve Technical Bulletin

17. After installation of the replacement valve is complete, except for the

attachment of the red lead wire, turn on the gas at the manual
shutoff valve.

a. Reconnect the power supply lead wire to the ignition control and

turn the power On.

b. Set the thermostat to the highest setting. The pilot valve will

open, spark will be energized, and the pilot will light.

c. Test for gas leaks in the pilot line with a soap solution.

d. After the check is complete, turn off the power and connect the

red lead wire to Terminal 3 on the ignition control.

18. Turn on the power and set the thermostat to the desired setting.

Advertising