Behlen 54150178 User Manual

Page 3

Advertising
background image

You can now remove the basin with the heat pad
assembly by lifting up on the rim of the basin
opposite of the drain, illustration 4.

You will now have three pieces, the float cover
assembly, the basin assembly and the base
assembly.

If you are using expandable anchor bolts,
proceed as follows: Center the drinker base
assembly on the pad and transfer the mounting
hole locations to the pad, illustration 5.

Following these marks drill four 3/8” dia. x 2”
deep holes in the concrete platform. Turn the
drinker on its side and apply caulking around the
bottom outer edge and center opening. Make
sure to apply enough caulking to seal any

irregularities between the drinker and the
platform, see Illustration # 6.

Secure the drinker base to pad using four
3/8” x 4” expandable anchor bolts with 3/8”
fender washer (purchased locally),

While the basin is off, it is good time to
install the ¾” hose barb connection to the
riser pipe. Reinstall the basin assembly to
the base and remove the side access door.
You can leave the float cover off until the
water level is adjusted.

Illustration 4 - Removing Basin

Illustration 5 - Transfer & Drilling Holes

Illustration 6 - Caulking Bottom

F-20652

2-24-09

ASSEMBLY INSTRUCTIONS

Illustration # 3B - Removing Float Cover

Advertising