Installation – CAMCORP Blower Package with Sutorbilt Blower User Manual

Page 5

Advertising
background image

4

CAMCORP, Inc.

Phone: 913-831-0740 ~ Fax: 913-831-9271

www.camcorpinc.com

INSTALLATION

CAMCORP’s positive displacement blower package consists of a positive displacement
blower, a vertical or horizontal frame assembly, a motor, take-up table, or motor slide
rails, V-belt drive and belt guard, an air intake or inline filter, intake and discharge
silencer, a pressure or vacuum relief valve preset at the maximum pressure or vacuum
rating of the blower, flexible connections, a check valve (pressure blower assemblies
only), pressure/vacuum gauge and pressure or vacuum switch. (Vacuum blower package
does not include an inlet silencer as a standard offering)

Assembly may be accomplished through the following:

1.

Locate and anchor the blower base assembly in its permanent location.

2.

Check all bolted connections for tightness.

3.

Check belts for proper tightness.

4.

Zero out pressure or vacuum gauge.

5.

Set pressure on pressure/vacuum switch to correct setting.

Lubrication:

CAMCORP uses positive displacement blowers from several manufacturers. General
lubrication information is given in the Maintenance Section; for specific information on
your positive displacement blower, see the manufacturers manual included with this
manual.

CAUTION: All blowers are shipped dry from the factory. Do not attempt to run the
blower before following proper lubrication instructions as permanent damage to the
gears, bearings and seals will occur.

Advertising