Wind-o-w arm sequence of opera tion, Page 16 – Louisville Tin and Stove WOW253 User Manual

Page 16

Advertising
background image

WIND-O-W

ARM SEQUENCE OF

OPERA

TION

STEP #

1)

Thermostat calls for heat.

2)

Draft Inducer turns on.

3

)

Pressure switch closes.

4

)

Spark ignition begins.

5

)

Gas flow to burner

.

6

)

Burner ignition proven.

7

)

Circulating Blower on.

8)

Heater burns through heating cycle.

9

)

Thermostat satisfied.

1

0

)

Gas flow of

f to burner

.

11

)

Draft inducer off.

1

2

)

Circulating Blowers off.

13)

Heater in stand-by

.

NOTE: IF

THERE IS

A

MALFUNCTION IN STEPS 3, 5, 6

THE OPERA

TION SEQUENCE

WILL

ST

O

P

A

T

THA

T

POINT

. FOR STEPS 5 OR 6, IF

AFTER 2

ADDITIONAL

A

TTEMPTS MALFUNCTION STILL

OCCURS,

THE CON-

TROL

WILL

LOCK OUT

FOR ONE HOUR. FOR PURPOSE OF

TESTING

, THE ONE HOUR LOCKOUT

CAN BE

OVERRIDDEN

BY

RESETTING THE THERMOST

A

T

OR

INTERRUPTING THE

ELECTRICAL

POWER.

Page 16

Ä

Pressure switch

closes proving

inducer

Heater

in

stand-

by

Thermostat

calls for

heat

Power

on to

draft

inducer

Pressure

switch

closes

inducer

proved

Spark

ignition

energized

Gas

valve

opens

gas

flow to

burner

Burner

flame

proved

Blower

on

Heat

cycle

Thermostat

satisfied

Д

ДД

Д

Д

Д

Д

Д

ДД

ДД

Д

Gas

valve

closes

gas flow

to burners

off

Draft

inducer

off

Blower

off

Heater

in

stand-

by

Д

Д

Inducer

continues to

run

Ä

One Hour

Lock Out

Ä

15 Sec.

inter

purge

3 Attempts

for ignition

Д

Д

Д

Д

30 Sec.

180 Sec.

90 Sec.

4 Sec.

NO

NO

YES

YES

NO

NO

YES

YES

Advertising