Step 3 install the idler pulley, Assembly – Chamberlain WD962KEV User Manual

Page 8

Advertising
background image

7

Assembly

STEP 3 Install the idler pulley

1. Lay the belt beside the rail, as shown. Grasp the end with the hooked trolley connector and

pass approximately 12" (30 cm) of belt through the window. Keep the ribbed side toward the
rail, and allow it to hang until Assembly Step 4.

2. Remove the tape from the idler pulley. The inside center should be pre-greased. If dry,

regrease to ensure proper operation.

3. Place the idler pulley into the window as shown.
4. Insert the idler bolt from the top through the rail and pulley. Tighten with a 3/8" lock washer and

nut underneath the rail until the lock washer is compressed.

5. Rotate the pulley to be sure it spins freely.
6. Locate the rail tab. The rail tab is between the idler bolt and the trolley in the front rail section.

Use a flat head screwdriver and lift the rail tab until the tab is vertical (90º).

HARDWARE

Bolt

Nut 3/8"

Lock Washer 3/8"

Screwdriver

Rail

Trolley Connector

Bolt

Lock Washer 3/8"

Nut 3/8"

Rail
Tab

CORRECT

INCORRECT

Rail Tab

Idler Pulley

Grease Inside Pulley

Advertising