Rotisserie installation and operating instructions – Crown Verity RT-72 User Manual

Page 2

Advertising
background image

1

ROTISSERIE INSTALLATION AND OPERATING INSTRUCTIONS

CONGRATULATIONS, You have purchased a Crown Verity Inc. rotisserie for use with
your MCB. These rotisseries are the finest on the market, they were developed through
months of research to ensure years of trouble free easy operation. With proper care the
RT should last a lifetime. Thank you for choosing this quality product.

The RT’s require some simple assembly, the following instructions will provide a step by
step guide to the installation of your rotisserie. You must have a roll cover with your MCB
(1 or 2 with MCB 60 & 72).

Step 1 - Bearing Installation

There are two or four bronze bearing plates with your kit; these MUST be installed on the
inner (stationary) wall of the roll top(s).

Insert the machine screws from the outside so that the nuts and lock washers are to the
inside. Also be sure to install the bearing plates to the inner side of the side panels. If
you don’t you will have difficulty closing the roll top(s).

Once all of the bearing plates are mounted, you are ready to install the mounting plate.
The screw holes in the center of the mounting plate should line up with the center line of
the bearing plate(s) and must abe mounted opposite the push handle.

Step 2 - Mounting Plate Installation

Make sure that the open end of the mounting plate is at the top and the closed end to
the bottom, this will allow the motor assembly to drop in from the top. Install machine
screws from the outside with nuts and lock washers to the inside of the unit.

Installation is complete. You are ready to use your rotisserie.

CROWN VERITY INC., 37 ADAMS BLVD., BRANTFORD, ON. CAN. N3S 7V8

TEL: (519) 751-1800

FAX: (519) 751-1802

www.crownverity.com

Email: [email protected]

Advertising
This manual is related to the following products: