Crossbar mounting bracket installation, Ceiling hardware, Support installation parts – Casablanca Fan Company Verrazano 65GxxD User Manual

Page 4

Advertising
background image

4

CROSSBAR MOUNTING BRACKET INSTALLATION

JOIST

CEILING

WIRING

CROSSBAR

MOUNTING

BRACKET

FLAT

WASHER

GREEN

GROUND

WIRE

CEILING FAN

APPROVED

WIRING BOX

RIDGE

SIDE

DOWN

APPROVED

OUTLET BOX

HARDWARE

Note: After removing the old fi xture, check the outlet box
to ensure that it is supported by a joist or beam across its
upper surface. If not, a 2” x 4” stud must be installed.

Step 1. Remove the knockout plug in the center of the out-
let box or drill a

1

/

2

hole for the lag screw to pass through.

Then drill a

1

/

4

guide hole into the joist or beam to a depth

of 3

.

Step 2. Route the outlet box wires through the keyhole slot of
the crossbar mounting bracket as shown. Attach the crossbar
mounting bracket to outlet box with screws provided, assuring
that the outlet box wires are not pinched by the washer.

CAUTION: To reduce the risk of personal injury,
use only the mounting hardware provided with
the approved outlet box to install the crossbar
mounting bracket.

CEILING HARDWARE

WIRE NUT (4)

ADDITIONAL HARDWARE

2

1

/

4

” x 8-32 ROUNDED

HEAD SCREW (2)

FLAT WASHER (2)

1” x 8-32 ROUNDED
HEAD SCREW (2)

SUPPORT INSTALLATION PARTS

LAG SCREW

¼” #7 X 5” (1)

LARGE

FLAT WASHER

¼” (1)

WARNING!

SUPPORT DIRECTLY TO

BUILDING STRUCTURE ONLY.

CROSSBAR MOUNT-

ING BRACKET

Advertising