Sheet #5 – Produits Neptune 48 KARMA User Manual

Page 5

Advertising
background image

3

STEP 4 Towel bar installation

Position the bar against the fixed panel keeping a plastic
washer in between the metal and the glass.
Screw from inside inserting correctly the plastic protection into
the hole in the glass and the plastic washer in between the
glass and the screw. (Figure 4)

4

STEP 5 Support tube hook installation

Position the support tube hooks against the interior of the fixed
glass panel (Figure 5) inserting a plastic washer in between the
metal and the glass.
Screw gently and verify for proper integration of the plastic nut
inside the hole of the glass panel.
Do not strongly tighten at this step.

5

STEP 3 Fixed side panel installation

Position the fixed side panel against the wall, verify for proper
integration in the interior of the ‘’U’‘ channels.
Verify the panel is perfectly steady and keep in position inserting,
if needed, the clear plastic shims inside the ‘’U’‘ channel.
Immediately remove any surplus silicone with a clean dry cloth.
Position the exterior plate of the bottom wall support bracket on
the other side of the glass with a clear plastic spacer in between
both of them and screw gently until partial resistance.
Make sure both parts of the support bracket are correctly aligned
and are never in contact with the glass.
Repeat the operation with the top wall support bracket, then
tighten gradually and entirely the screws, always verifying the
aligment.

Advertising
This manual is related to the following products: