Sheet #9, Care of your frameless shower enclo- sure – Produits Neptune 48 KARMA User Manual
Page 9
16
24H
14
Step 13 Final touch (suite)
Place the hook caps.
Set the ‘’back’‘ bumper in order to get the widest door opening
making sure the door handle doesn’t hit the waterproof gasket
#12 and set the ‘’front’‘ bumper in order to make sure the door
closes perfectly without strongly hitting the wall.
°6mm
Wall
‘’U’‘ channel
ST3.5X25
Wall plug
15
Step 14 Wall ‘’U’‘ channel installation
Position the ‘’U’‘ channel #7 at the end of the door panel and
close it.
Keeping the ‘’U’‘ channel against the wall, open the door making
sure not to move anything and mark the holes location on the
wall.
Remove the ‘’U’‘ channel, drill the holes with the appropriate drill
bit and insert the wall plugs.
Apply a thin bead of silicone on the backside of the ‘’U’‘ channel,
put it back in place and screw tighly on the wall.
STEP 15 Assure waterproofing
Carefully apply a thin bead of clear silicone to the exterior
locations indicated. (Figure 16)
Immediately clean any excess silicone with a clean dry cloth.
Care of your frameless shower enclo-
sure:
•DO NOT USE YOUR SHOWER ENCLOSURE WITHIN 24
HOURS AFTER ASSEMBLY.
•NEVER use caustic cleaning products or abrasive material, nor
any cutting instruments when cleaning the hardware or glass.
To conserve the new charactaristic of the metal and glass pan-
els, occassionally clean them
with gentle detergent and
water.
Use of abrasive products on any part of the shower enclosure
automatically voids the warranty.