Sheet #6 – Produits Neptune 48 KARMA User Manual

Page 6

Advertising
background image

6

6a

6b

16

7

D

C

°6mm Drill

A

B

E

STEP 6 Door support tube installation

Insert the bumpers on the door support bar, ensuring that the plas-
tic nozzles are towards the interior of the bar (Figure 6).
Do not tighten them at this step.
Position the wall fixation ring at the end of the bar and tighten the
blockage screw.

Temporarily install the bar on its hooks, verify the ‘’front’‘ bumper is
now close to the wall and the ‘’back’‘ bumper is in between the two
hooks, position the bar perfectly so it is abutting the opposed wall.
Strongly tighten the hook blockage screws (Figure 6a).
Using the provided plastic wrench, turn the white plastic nuts of the
hooks until the door support tube is slightly tilted towards the front.
(Figure 7c)
Mark the position of the tube support on the wall, remove and
place it securely aside.
Remove the wall support from the tube, place it against the wall at
the previously marked location.
Mark the center of the support on the wall.
Drill the hole with the appropriate drill bit, insert the wall plug and
fix the support strongly on the wall.
Replace the stainless steel tube at its position and strongly tighten
all the blocking screws, making sure to keep the bar’s inclination.

STEP 7 Door guide installation

Remove the protective ribbon of double backed tape under the
door guide and position at the end of the fixed glass panel.
Tighten the blockage screw inside.
In the case of a base made of porous material (stone, slate,
etc.) temporarily place the door guide at the end of the fixed
glass panel and mark the drilling position on the base.
Remove the door guide and drill the base at marked location
with the appropriate drill bit.
Secure it to the base with the provided plugs and screws.

Advertising
This manual is related to the following products: