Produits Neptune SHOWER TOWER User Manual

Page 3

Advertising
background image

3

SHOWER TOWER INSTALLATION GUIDE

• Read completely and thoroughly this guide before proceeding;

• Assure that all material and parts are intact are not missing;

• It is strongly recommended to contact a certified plumber to complete the installation;

• Wear security glasses, protective gloves and clothing during installation;

• Make sure to have all the needed tools for installation as pictured below;

• It is important to have a second person to assist during the entire installation for reasons of security and to

facilitate the task;

• Respect at all times your local building codes;

• The installation of dedicated shut-off valves upstream from the water supply is preferable.

GENERAL INFORMATION

REQUIRED TOOLS

64

1

/2

"

(

16

38

m

m

)

8" (203 mm)

4 1/4" (108 mm)

18" (456 mm)

3" (76 mm)

5 1/2" (140 mm)

ThermostaƟc valve

On/Off valve hand shower

On/Off valve body jets

On/Off valve shower head

TECHNICAL DRAWING

Advertising