Produits Neptune SHOWER TOWER User Manual

Page 5

Advertising
background image

5

SHOWER TOWER INSTALLATION GUIDE

Apply a bead of silicone to the back of the wall brackets, then screw them according to the nature of the interior wall

support. The top hole of the bottom bracket must be drilled 6’’ (153mm) from the bottom of the tower. The top hole

of the top bracket must be drilled 34-¼’’ (870mm) higher (figure 2). IMPORTANT: It is essential to ensure that the

wall can support the weight of the tower.

STEP 3

FIGURE 2

64 1/2" (1638 mm)

22 3/4"

(578 mm)

10 1/4"

(260 mm)

34 1/4"

(870 mm)

6" (153 mm)

Without installing the tower onto the wall supports, hook-up the hot and cold water supply. Connect the hot water

supply to the hose with the red tag, and the cold water supply to the hose with the blue tag. Assure that the

connecting hoses do not disturb the positionning of the tower, and that the rubber linings sit firmly against the wall.

After turning on the water, make sure there are no leaks.

STEP 4

Advertising