6 unpacking, setup and commissioning – KERN & SOHN ILJ 25K-4CM User Manual

Page 14

Advertising
background image

14

ILJ-C/ILS-C-BA-e-1320

6 Unpacking, Setup and Commissioning

6.1 Installation Site, Location of Use

The balances are designed in a way that reliable weighing results are achieved in
common conditions of use.
You will work accurately and fast, if you select the right location for your balance.

Therefore, observe the following for the installation site:

Place the balance on a firm, level surface;

Avoid extreme heat as well as temperature fluctuation caused by installing

next to a radiator or in the direct sunlight;

Protect the balance against direct draughts due to open windows and doors;

Avoid jarring during weighing;

Protect the balance against high humidity, vapours and dust;

Do not expose the device to extreme dampness for longer periods of time.

Non-permitted condensation (condensation of air humidity on the appliance)
may occur if a cold appliance is taken to a considerably warmer environment.
In this case, acclimatize the disconnected appliance for ca. 2 hours at room
temperature.

Avoid static charge of goods to be weighed or weighing container.


If electro-magnetic fields or static charge occur, or if the power supply is unstable
major deviations on the display (incorrect weighing results) are possible. In that case,
the location must be changed.

6.2 Unpacking and checking

Remove device and accessories carefully from packaging, remove packaging

material and place device at the planned work place. Verify that there has been no

damage and that all packing items are present.

Scope of delivery / serial accessories:

Balance, see chap. 2

Mains adapter

Operating manual

Protective cover

Flush-mounted hook

Transport locking device (models ILJ-C only)

Advertising
This manual is related to the following products: