5 maintenance and calibration, 1 maintenance, 2 charging – KERN & SOHN FC 10 User Manual

Page 14: 3 calibration

Advertising
background image

14

FC-BA-e-1410

Fig 4-2

Pin7 with Pin6 will be connected when an overload alarm occurs.
In Preset Mode, Pin7 to Pin6 is connected when the measured value exceeds the
upper limit; Pin4 to Pin6 is connected when the measured value is below the lower
limit.

! Maximum permissible voltage: pin 7 to 6, pin 4 to 6 must be lower than 35V ;
pin 6 to 7, pin 6 to 4 must be lower than 6V .

5 Maintenance and Calibration

5.1 Maintenance


After use, please keep the instrument body clean, do not let oil or other substances
infiltrate into the body and the screen, not to damage the instrument.
Please do not forget to remove the load after measurement. Applying a load for a
long time may affect the accuracy of the instrument.
Unless there is a special need, please do not switch off the Auto Power, because it
can reduce the consumption of the battery and extend batteries life.

5.2 Charging


When the batteries are low, the icon “

” will be displayed. The batteries should be

charged immediately.
Connect the gauge and the charger using the USB cable, and then connect the
charger with AC socket to start charging.
It takes about 3~4 hours for completely charging.

5.3 Calibration


Because of the sensor’s material performance or the influence of external factors,
there may be errors in a certain range after being used a period of times.

The force gauge can be sent to us for a specialized testing and for calibration.
If you have some standard force weights or the other standard load and some test
stand, you may calibrate it also on your own, as shown below:

❶Mount the force gauge to a test stand or fix it anywhere else

❷Remove the tare by using the key

.