Fs storage system assembly instructions #3, Malone – Malone MPG331 User Manual

Page 3

Advertising
background image

Installation & Loading Instructions - FS Storage Rack

TM

MALONE

R

8

. Insert the Top Upright Assembly from Step

8 into the Couplings connected to the lower

assembly created in instructions 2-6.

See image 9.

. Attach the Top Upright Assembly by aligning the top

mounting holes and installing two 45mm Bolts (I),

washers and lock nuts. Firmly tighten all Coupling

bolts on both sides of the frame. See image 10.

. Locate and assemble two Cross Supports (E) with

the two Top Uprights (B) as shown. Use nuts and

washers provided. Firmly tighten. See image 8.

NOTE: The Cross Support with the MALONE logo

should be in the top (highest) position.

10

9

11

. Install Foam Blocks and Upright Pads where

applicable. See Page 4 for a listing of all

rack systems and the correct components

included with each system. See image 11.

Advertising
This manual is related to the following products: