NORAC UC4+BC+FC2 User Manual

Page 26

Advertising
background image

24

19. Route the sensor branch cable (C02) to

the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.

20. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the

main section, parallel lift, and
FOLDING boom movement.

Figure 27: Cable Configurations: C02, C02B and C11

Advertising