NORAC UC4+BC+FC2 User Manual
Page 26
Advertising
24
19. Route the sensor branch cable (C02) to
the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.
20. Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.
Figure 27: Cable Configurations: C02, C02B and C11
Advertising