Install the header bracket, Installation step 2 – Chamberlain WHISPER DRIVE HD900D User Manual

Page 13

Advertising
background image

13

Lag Screws
5/16"x9x1-5/8"

– Finished Ceiling –

Door
Spring

Header Wall

UP

Ceiling Mounting Holes

6" (15 cm) Maximum

Header

Bracket

Vertical
Centerline
of Garage Door

Garage Door

Vertical Centerline
of Garage Door

INSTALLATION STEP 2

Install the Header Bracket

You can attach the header bracket either to the wall above the
garage door, or to the ceiling. Follow the instructions which will
work best for your particular requirements. Do not install the
header bracket over drywall. If installing into masonry, use
concrete anchors (not provided).

WALL HEADER BRACKET INSTALLATION

• Center the bracket on the vertical centerline with the bottom

edge of the bracket on the horizontal line as shown
(with the arrow pointing toward the ceiling).

• Mark the vertical set of bracket holes. Drill 3/16" pilot holes and

fasten the bracket securely to a structural support with the
hardware provided.

Lag Screw
5/16"x9x1-5/8"

HARDWARE SHOWN ACTUAL SIZE

CEILING HEADER BRACKET INSTALLATION

• Extend the vertical centerline onto the ceiling as shown.

• Center the bracket on the vertical mark, no more than

6" (15 cm) from the wall. Make sure the arrow is pointing away
from the wall. The bracket can be mounted flush against the
ceiling when clearance is minimal.

• Mark the side holes. Drill 3/16" pilot holes and fasten bracket

securely to a structural support with the hardware provided.

UP

Wall Mount

Optional
Mounting Holes

Lag Screws
5/16"x9x1-5/8"

Highest Point of
Garage Door Travel

Vertical
Centerline
of Garage Door

Header Wall

Garage Door

Door Spring

2x4
Structural
Support

Vertical
Centerline
of Garage Door

Header

Bracket

Horizontal
Line

Advertising