Fieldpilot, Preparing the left and right steering connections – TeeJet FieldPilot Install John Deere 8x00 User Manual

Page 15

Advertising
background image

www.teejet.com

14

FieldPilot

®

7. PREPARING THE LEFT AND RIGHT STEERING CONNECTIONS

Underneath the tractor, just behind the front differential, find the left and right steering cylinder hoses and

their connection point to the steel lines from under the cab.
Figure 1-9: Preparing the Left and Right Steering Connections

Uncouple the hoses from the steel lines (be sure to keep track of which hose is connected to which steel

line), and install Run Tees

(Q)

into the end of the steel lines. Then reattach the steering cylinder hoses to the

other ends of these run tees.
Figure 1-10: Uncouple the Hoses

Q

Advertising