➨ Screw in four socket head screws fixing housing cover cross-

wise (e. g. in the sequence

➀, ➁, ➂, ➃) first slightly, then

tighten.

☞ Do not tighten until head cover is in contact with housing,

torque 12 Nm.

Individual performance check of a pump head:

Assembling pump heads:

➨ By turning eccentric bushing (front of connecting rod), bring

connecting rod into a position in which diaphragm is in con-
tact with housing and centred with respect to bore.

Reassemble in reverse order.
➨ Install head cover, valves and housing cover with housing

cover insert.

☞ Make sure that the valves are correctly seated: Valves at

the outlet with round centred opening under valve, valves at
the inlet with kidney-shaped opening beside valve.

➨ By turning eccentric bushing, bring connecting rod into up-

per turning point position (Max. stroke of the rod).

☞ Pay attention that the diaphragm stays positioned centrally

so that it will become clamped uniformly between housing
and head cover.

By measuring the pressure at the inlet port of the individual
head:
Use a suitable vacuum gauge (e. g. DVR 2, cat. no.: 682902),
make sure that it is correctly calibrated, and measure the pres-
sure at the inlet port. A vacuum of less than 120 mbar should
be indicated.
☞ If the reading is higher, recheck the pump chamber and make

sure that the valves and the diaphragms are correctly seated
(diaphragms concentric with bore).