General view basic setups, Cvc 2, Ready to start – VACUUBRAND PC 620 User Manual

Page 20

Advertising
background image

Documents are only to be used and distributed completely and unchanged. It is strictly the users´ responsibility to check
carefully the validity of this document with respect to his product. Manual-no.: 999029 / 01/10/2009

page 20 of 48

CVC 2

II

setting pressure unit (mbar / Torr / hPa)

configuration of the coolant valve if applicable

automatic identification of the solenoid operated in-line valve

setting basic setup

ready to

start

basic setup ”Standard”

(factory-set)

controller switches
-

solenoid operated in-line valve (indispensable)

-

coolant valve (optional)

basic setup ”Management”*
controller switches
-

pump

-

solenoid operated in-line valve if connected

-

coolant valve (optional)

basic setup ”VACUU•LAN”*
controller switches
-

pump according to preset pressure and time values

-

solenoid operated in-line valve if connected

-

coolant valve (optional)

* only in combination with Vacuum-Management-System VMS Module A

basic setup ”Management

Plus”*

controller switches
-

pump, but with after-running to pump out condensate

-

solenoid operated in-line valve (indispensable)

-

coolant valve (optional)

General view basic setups

Advertising
This manual is related to the following products: