Installation step 1, Determine header, Location – Sears 139.53535SRT1 User Manual

Page 12: Proceed to step 2, page 14

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

installation Section: Pages 12 “■ 27

installation Step 1

Determine Header

Bracket

Location

Installation procedures vary according to
garage door types. Follow

the instructions

which apply to your door.

V//■SECTIOK^L.Oodr^ afid^. .■ ■ ■:

.;ONE.»PÍEeÉVD©Gr:Witl1 Track

Finished

Ceiling

If the header bracket is not rigidly fastened to
a structural support on the header wail or
ceiling, the safety reverse system may not

work properly (see page 30).

The door might

not reverse when required, and couid cause
serious injury or death.

The

garage

door

springs,

cables,

pulleys,

brackets and their hardware are under extreme
tension.

Do not attempt to ioosen, move or

adjust them yourseif. Serious personai injury
or death couid resuit.

Call for professional

garage door service.

• Close the door and mark the inside

vertical centerline of the garage door.

• Extend the line onto the header wall

above the door.

Remember, you can fasten the
header bracket within 2 feet of the
left or right of the door center

oniy

if

a torsion spring or center bearing
plate is in the way; or you can attach

it to the ceiling (refer to page 14)

when clearance is minimal. (It may

be mounted on the wall upside down
If necessary, to gain approximately

1/2".)

If you need to install the header bracket
on a 2x4 (on wall or ceiling), use lag
screws (not supplied) to securely fasten
the 2x4 to structural supports as shown
here and on page 13.

Open your door to the highest

point of travel as shown. Draw

an intersecting horizontal line
on the header wall 2" above
the high point. This height will
provide travel clearance for the
top edge of the door.

Door clearance brackets are

available for sectional doors
when headroom clearance is
less than 2". See accessory
page 38.

Ceiling

Door

1

Header

W all

— 2”

Track

.'y

■ .............................................. ... ■

Highest Point

of Travei

Proceed to Step 2, page 14.

Sectional door

with curved track

Header

_W ali Tcack

-2"

One-piece door

with horizontal track

12

Advertising