Installation, Tool list, Additional materials – Sears 32025 User Manual

Page 5: Location, Minimum clearances to be maintained

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

INSTALLATION

IMPORTANT: Leave these instructions

with the appliance.

OWNER: Keep these instructions for

future use.

TOOL LIST

The following tools are needed to Install your new
counter unit.

• Pipe wrenches

• Flat bladed screwdriver

• Rule or tape measure and straightedge

• Hand saw or saber saw

ADDITIONAL MATERIALS

• Gas supply line shut-off valve

• Pipe joint sealant (resistant to L.P. gas)

CUTOUT AND COUNTER UNIT DIMENSIONS

TABLE 1

Fig. 1

DIMENSIONS

A

30 1/4"

B

21 1/4"

C

28-3/8"

D

19-3/8"

E

19-1/2"

F

28-1/2"

G

14-1/4"

H

3"

J

1-3/4"

K

3-1/4"

LOCATION

See Figures 1 and 2 and Table 1 for all rough-ln and
spacing dimensions. These dimensions must be met
for safe use of your counter unit. See Fig. 3 for recom­
mended iocation of gas supply line. Do not Install the

unit near an outside door or where a draft may affect Its

use.

MINIMUM

CLEARANCES

TO

BE

MAINTAINED:

1-3/4" between cutout rear edge and wall behind unit.

3-1/4" between cutout front edge and counter front
edge.

30" between cooktop and nearest overhead surface.

3" on the right and on the left side of the cutout to a

height of 18".

MINIMUM CLEARANCES TO

ADJACENT CONSTRUCTION

IMPORTANT:

Reaching over surface burners can cause fire or burns.

You should not use storage space above the cooktop. If
you choose to use cabinets above the cooktop, install
a range hood that sticks out at least 5" beyond the front

of the cabinets. Cabinets installed above a cooktop may
be no deeper than 13".

NGINS18

Advertising
This manual is related to the following products: