Installation – Sears KENMORE 1700 User Manual

Page 5

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

installation

(on sheet metal plenums)

riB Install motor bracket on left side. Make sure bracket

is firmly seated (Fig. 6).

w

Install

wire

support

and

nylon

bearing

in

lances. Be sure groove in nylon bearing is toward inside of
humidifier. Bend that portion of the wire support leg ex­

tending below the lance, outward, to lock support in lances

(Fig. 7)

.. D

After conversion, unit should look like (Fig. 8).

FIBER PLENUM DUCTS

NOTE:

The mounting screws supplied are for standard in­

stallation on sheet metal plenum ducts. If you have fiber

plenum ducts, install the humidifier and components with

thru-bolts, nuts, and washers (not supplied). If necessary,

reinforce the humidifier mounting area on fiber ducts with

sheet metal and provide additional bracing as required to
support the weight of the humidifier and water. (This fiber

duct installation hardware is not supplied and must be pur­
chased from your local hardware store.)

1

Mark a level line on selected plenum at bottom lo­

cation for humidifier.

NOTE:

Unit must be installed level from left to right and

front to back to maintain proper float control of water.

Hold the humidifier housing against the plenum with the bottom

edge on the level line. Mark location of the (3) holes and large

rectangular opening (Fig. 9).

See Fig. 10 for clearance required to open top cover when re­

moving media wheel for servicing. Cut opening with tin snips or
saw and drill (3) 1/8" diameter holes as shown in Fig, 11.

CAUTION:

DO NOT DRILL INTO AIR CONDITIONING COIL.

Advertising