The Lincoln Electric Company
Cleveland, Ohio 44117

Assembly and Installation

SEC. J2.3 ELEaRICAL INSTALLATION

Sec. J2.3.1

Input Cable: LN-7 to Power Source

The input cable between the wire feeder and the power

source consists of a four-conductor control cable and an
electrode cable. The control cable has lugged leads on the

power source end and a polarized plug on the wire feeder
end. With the power source turned off, install the input
cable per the following instructions:

i

I. Connect the end of the control cable with the lugged

‘.-leads to a constant voltage type power source. For

Lincoln power sources follow exactly thé instructions
(including all jumpers on the power source terminai
strips) for the specific power source per the wiring

diagrams in Sec. J2.3.2.

2. For constant voltage power sources not included in Sec.

J2.3.2, request a copy of Sec. J2.3.3 for connection
instructions.

3. If input cables longer than the standard length (available

as 7, 25, 50, 75 and 100’ lengths) must be used, 50’
K-177 extension cables can be installed. These have
polarized plugs on each end of the control cable and a
4/0 electrode cable. Install the extensions between the
standard input cable and the wire feeder. Total input

lead length should not exceed 400’. When using the
longer lengths of extension cables, it may be necessary

to add parallel electrode cables to limit the voltage drop

in the cable.

4. Loosen the screws holding the clamp to the rear vertical

support of the wire feeder frame. Put only the electrode
cable under the clamp.

5. Coimect the end of the electrode cable to the end of the

brass block on the wire feeder using the bolt provided.
Be sure the cable is placed to allow easy access to the
drive roll and guide tube screws. (See photo below.)
Tighten the screws on the electrode cable clamp.

6. Run the control cable under the wire feed motor and

insert the plug into the mating receptacle below the
LN-7 nameplate.

7. Connect a ground lead of sufficient size and length (per

the following table) between the To Work’ stud on the
power source and the work. Be sure the connection to
the work makes tight metal-to-metal contact.

Current

Amps

60% Duty Cycle

Copper Ground Cable Length

Up to 50'

50' - 100'

300

0

00

400

00

000

500

00

000

600

000

0000

September 1976

-9-

Advertising
This manual is related to the following products: