Bolens 248-645A User Manual

Page 7

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

9.

Secure the other end of high pressure hose to

pump. A 3/4" wrench is required. See figure 9.
Hold 5/8 hex on hole assembly while tightening cap.

NOTE

Use hydraulic sealant tape on threads.

FIGURE 9

10.

Assemble the engagement handle to the beam

assembly using shoulder bolt (K) and flat washer

(L). A 5/8" wrench is required. See figure 10.

------------- —

EIVLiMljCmciM 1

m

HANDLE

BEAM
ASSEMBLY

11.

Place end of engagement rod on valve spool and

secure with clevis pin (P) and cotter pin (N).
See figure 11.

FIGURE 11

12. Thread ferrule (M) on engagement rod so there is

approximately 1/2" of thread showing.

Engagement handle must be at 90° to beam. Insert

ferrule into engagement handle. See figure 12.

NOTE

Engagement handle locked in reverse

position must depress valve spool to
limit.

FIGURE 10

FIGURE 12

Advertising