Crossbar mounting bracket installation, Lag screw installation – Casablanca Fan Company New Orleans Centennial 69xxD User Manual

Page 4

Advertising
background image

4

CROSSBAR mOUNTINg BRACKET INSTALLATION

JOIST

CEILINg

WIRINg

CROSSBAR

mOUNTINg

BRACKET

FLAT

WAShER

gREEN

gROUND

WIRE

CEILINg FAN

AppROVED

WIRINg BOX

RIDgE

SIDE

DOWN

AppROVED

OUTLET BOX

hARDWARE

note: After removing the old fixture, check the outlet box

to insure that it is supported by a joist or beam across its

upper surface. If not, a 2” x 4” stud must be installed.

Step 1. Remove the knockout plug in the center of the out-

let box or drill a

1

/

2

″ hole for the lag screw to pass through.

Then drill a

1

/

4

″ guide hole into the joist or beam to a depth

of 3″.

Step 2. Route the outlet box wires through the keyhole slot of

the crossbar mounting bracket as shown. Attach the crossbar

mounting bracket to outlet box with screws provided, assuring

that the outlet box wires are not pinched by the washer.

CAUTION: To reduce the risk of personal injury,

use only the mounting hardware provided with

the approved outlet box to install the crossbar

mounting bracket.

WARNINg!

SUppORT DIRECTLY TO

BUILDINg STRUCTURE ONLY.

Step 3. With the large washer attached, pass the lag screw

through the center hole of the crosbar mounting bracket

and screw into guide hole. Tighten until outlet box is firmly

mounted to beam. This box must be firmly secured to the

ceiling. We recommend that the ceiling fixture outlet box

be of sufficient capacity enabling it to support the weight

of fan and light fixture under any conditions.

LAg

SCREW

LAg SCREW INSTALLATION

LARgE

WAShER

Advertising