Pg 11.pdf, General pre-operation instructions, Priming pump for electric packs – Dynasty Spas 2006 User Manual

Page 11

Advertising
background image

- 11 -

Priming Pump For Electric Packs

The Power pack system is located under the skirting. The equipment
can be serviced by simply removing the door. The door is located on the
side of the spa where three panels are located, usually on the side of
the spa with the lounger, or the side where the topside control panel is
located.

It is important to make sure that all of the air is out of the pump(s)
before operating. To do this follow procedures below:

Turn off power at the breaker

Make sure the gate valves are open

Fill the spa with water going thru the filter

Turn the power on at the breaker

Start the pump on low speed and water should start circulating
within one to two minutes. If water does not start circulating, turn
pump from low to high until prime is picked up.

If pump still does not prime, please see “Trouble Shooting Guide”
located in the back of this manual.

Set thermostat, located on top side control panel, to desired
temperature and continue heating until desired temperature has been
reached. Depending on equipment, this will normally take 8 to 10 hours.

WARNING: Do not run spa with gate valves closed or run
pump with no water circulating in spa for long periods. This
could damage the spa equipment.

General Pre-Operation Instructions

Air Blower

Ozonator

(Optional)

Equipment Pack

2 Speed

High Performance

Pump

Gate Valves

Circulation

Pump

(Optional)

Auxiliary Pump

(Optional)

Flow Thru

Heater

Advertising