Unload, Jt5 operator’s manual – Ditch Witch JT5 User Manual
Page 71
Advertising
Transport - 70
JT5 Operator’s Manual
Haul
CMW
Unload
1.
Lower ramps.
2.
Remove tiedowns.
3.
Start drilling unit engine.
4.
Raise stabilizer and drill frame.
5.
Slow engine to low throttle and slowly back unit down trailer or ramps.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE:
•
Load and unload trailer on level ground.
•
Ensure trailer wheels are blocked.
•
Attach trailer to vehicle before loading or unloading.
Advertising