Lift, Tie down, Ongrade operator’s manual – Ditch Witch OnGrade User Manual
Page 49
Advertising
Systems and Equipment - 48
OnGrade Operator’s Manual
Job Box
CMW
Lift
Use a forklift or crane capable of supporting the
equipment's size and weight. See “Specifications”
on page 57 or measure and weigh equipment
before lifting.
•
If using forklift, slide forks into slots on sides
(as shown) or ends of box.
•
If using crane, use top lift points.
Tie Down
Properly tie down unit on truck or trailer before transport. Pass tiedown straps through top lift points or
across top of box to truck bed or trailer.
e14om008t.eps
Advertising