Rt80q operator’s manual – Ditch Witch RT80 User Manual

Page 175

Advertising
background image

Service - 174

RT80Q Operator’s Manual

As Needed

8.

Loop cable through links nearest connector
pin.

9.

Loosen plug on grease cylinder to relieve chain tension.

10. Stand clear of chain and remove lock key from connector pin. Drive connector pin out of link.

11. Unclamp links. Slowly release cable and lower chain to ground.

12. Lay chain on ground with teeth down.

Pressurized fluid or air could pierce skin and cause

injury or death. Stay away.

To help avoid injury: Service digging boom grease cylinder only while standing on opposite side of
boom. Wear gloves and safety glasses, and cover fitting with cloth when relieving pressure in cylinder.

Crushing weight could cause death or serious injury.

Use proper procedures and equipment or stay away.

Advertising