Gather information, All jobs, Ground-penetrating jobs – Ditch Witch SK750/SK755 User Manual

Page 31: Above-ground jobs

Advertising
background image

Prepare - 30

SK750/SK755 Operator’s Manual

Gather Information

CMW

®

Gather Information

A successful job begins before you start working. The first step in planning is reviewing information already
available about the job and jobsite.

All Jobs

Review Job Plan

Review blueprints or other plans. Check for information about existing or planned structures, elevations, or
proposed work that may be taking place at the same time.

Arrange for Traffic Control

If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.

Plan for Emergency Services

Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.

Ground-Penetrating Jobs

Notify One-Call Services

Contact your local One-Call (811 in USA) or the One-Call referral number (888-258-0808 in USA and
Canada) to have underground utilities located before digging. Also contact any utilities that do not
participate in the One-Call service.

Above-Ground Jobs

Locate Overhead Lines

Note location and height of all overhead lines in jobsite and ensure that fully lifted attachment and/or load
will not touch lines.

Advertising