EarthQuake 14267 User Manual

Page 11

Advertising
background image

11

Check for parts online at

www.getearthquake.com or call 800-345-6007 M-F 8-5

Operator’s Manual

Chipper/Shredders

FIGURE 8 - Discharge Bag (North American Models)

FIGURE 9 - Discharge Bag (CE Models)

Install Discharge Bag

This product comes with a discharge bag for collection

of debris as it exits the discharge chute. Install the bag as

shown in FIGURE 8 or 9.

Add Engine Oil

Refer to “Engine Oil Type and Capacity” in the Regular

Maintenance section for oil type and fill procedures.

Add Fuel

Refer to “Adding Fuel” in the Operation section for fuel

specifications and filling procedures.

Pull drawstring tight.

Lift discharge

chute and slide

bag over chute.

Make sure bag

noose fits over

top of discharge

chute and notch

in chute bottom.

Slide bag over dis-

charge chute.

Make sure bag

noose fits over top

of discharge chute

and notch in chute

bottom.

Pull drawstring tight.

Slide bag over dis-

charge chute.

Make sure bag

noose fits over top

of discharge chute

and notch in chute

bottom.

Advertising