Assembly – EarthQuake 14267 User Manual

Page 9

Advertising
background image

9

Check for parts online at

www.getearthquake.com or call 800-345-6007 M-F 8-5

Operator’s Manual

Chipper/Shredders

FIGURE 1 - Installing the Chipper Cone

A. Metal Cone Assembly

B. 5/18-18 Flange Nut

Assembly

Install Chipper Cone - All Models

1 . Position the chipper cone (A) over the three 5/16-18

threaded studs protruding from the engine plate, and

attach using three 5/16-18 flange nuts (B). SEE FIGURE 1

2. Rotate cone and cone base away from engine so cone

does not contact engine.

3. Tighten the flange nuts securely.

A

B

Install the Hopper - All Models

1. Attach the hopper to the rotor housing. Make sure

to engage the metal lip of the hopper liner inside the

housing.

2. Secure the hopper to the rotor housing using two 5/16 x

1/2 hex head bolts, two 5/16 flat washers. Do not tighten

hardware at this time. SEE FIGURE 2

3. From the inside of the hopper install one 5/16-18 flange

nut on each 5/16 weld stud. Finger tighten only at this

time.

4. Check that the hopper is seated correctly and tighten all

hardware.

Install the Handle - All Models

1. Lift the hopper handle up until the outer holes in the

handle align with the holes in the shredder hopper and

secure with 1/4-20 x 3/4 screws, washers, and nuts (A).

Insert the screws from the outside of the shredder hopper.

SEE FIGURE 3

FIGURE 2 - Attaching the Hopper

A

FIGURE 3 - Installing the Hopper Handle

A. 1/4-20 x 3/4 Screw & Nut

Advertising