Maintenance, Schedule & procedures, Check for loose hardware – EarthQuake 14267 User Manual

Page 16: Check safety labels, Inspect cone, hopper, & guards

Advertising
background image

Operator’s Manual

Chipper/Shredders

16

Check for parts online at

www.getearthquake.com or call 800-345-6007 M-F 8-5

Maintenance

Schedule & Procedures

The following schedule should be followed for normal care of your unit.

* Refer to engine owner’s manual. Change original engine oil after initial break-in period of 5-8 hours.

** More often in hot (over 85° F: 30° C) weather or dusty operating conditions.

SAFETY ITEMS

Before

Each

Use

Every 5

Hours

Every 25

Hours

Every 100

Hours

Every

250

Hours

Spring &

Fall

Check for loose hardware

X

X

Check all safety labels

X

Inspect cone, hopper, and guards.

X

CHIPPER MAINTENANCE ITEMS

Before

Each

Use

Every 5

Hours

Every 25

Hours

Every 100

Hours

Every

250

Hours

Spring &

Fall

Clean debris from engine and chipper. **

X

X

Inspect/Rotate Shredding Hammers

X

Inspect/Rotate Chipping Knives

X

ENGINE MAINTENANCE ITEMS

Before

Each

Use

Every 8

Hours

Every 25

Hours

Every 50

Hours

Every

100

Hours

Spring &

Fall

Check Engine Oil Level *

X

X

Change Engine Oil * **

X

Check / Change Engine Air Filter * **

X

Replace Spark Plug *

X

Check for Loose Hardware

Service Interval: Every 5 hours; every spring and fall.
Inspect the unit, checking for loose hardware or components.

Pay special attention to the hardware attaching the chipper

cone, hopper, axle, and front leg.

Check Safety Labels

Service Interval: Every spring and fall.
Check that the safety labels are in place and undamaged.

Sample illustrations and part numbers of the decals can be

found on page 6. Replace any damaged or missing decals.

Inspect Cone, Hopper, & Guards

Service Interval: Every spring and fall.
Check that the chipper cone, shredder hopper, and discharge

guards are in place, undamaged, and secure. Replace any

damaged or missing parts.

Advertising