Assembling and wiring the devices – Echelon Rapid Deployment Example for EES User Manual

Page 15

Advertising
background image

Rapid Deployment Example for EES

5

Assembling and Wiring the Devices

You can assemble the specified devices on a mounting board, and then wire them. The following
wiring diagram illustrates how to wire the devices. Observe that the network is divided into two zones:
Zone 1 includes a Nico switch, a lamp, and the Honeywell thermostat; and Zone 2 includes a Nico
switch, a lamp, and the Distech thermostat. The power supply and transformer provide power to the
L

ON

W

ORKS

devices in both zones, the SmartServer, and the Nico energy meter.

Advertising