Echelon Rapid Deployment Example for EES User Manual

Page 27

Advertising
background image

Rapid Deployment Example for EES

17

3. This Web page displays the expected maximum and current power usage for each zone in the

network (in kilowatts).

Using the Zone Lighting Web Pages

You can use the Zone Lighting Web pages to monitor and control the lighting in each zone on the
network. To open and use the Zone Lighting Web pages, follow these steps:

1. Expand the Lighting entry in the navigation pane on left side of the Web interface, and then click

Zone 1 Lighting or Zone 2 Lighting.

2. The Zone Lighting Web page opens.

3. The Switch and Lamps images indicate the current state of the Nico switch and lamp in the

respective zone.

4. You can click the Switch image to turn the lamp on or off. Each time you click the Switch image,

the Lamp image is updated to show the current state of the lamp.

Note: When you click the Switch image to control the Nico switch, a green hand manual override
icon (

) appears to the left of the Switch image. This indicates that the Switch image has the

highest priority for writing data point values to the switch device, which means that you cannot
use the device hardware to control the switch device. To use the device hardware again to control
the switch, click the green hand icon, which temporarily resets the priority of the subject data point
on the switch device to 255.

Using the Zone HVAC Web Pages

You can use the Zone HVAC Web pages to monitor and control the lighting in each zone on the
network. To open and use the Zone HVAC Web pages, follow these steps:

1. Expand the HVAC entry in the navigation pane on left side of the Web interface, and then click

Zone 1 HVAC or Zone 2 HVAC.

2. The Zone HVAC Web page opens.

Advertising