3 standard operation – Heath Consultants Gas Delivery Unit (GDUnet) User Manual

Page 91

Advertising
background image

GDUnet OPERATION

5-9

5.3 STANDARD OPERATION

net is connected to a mains power supply, the

green POWER ON
shown in Fig. 5-11.

Fig. 5-11 Power On

The following start up sequence will begin:

1.

light will be on but no messages are present.

2. After approximately 30 seconds the buzzer will sound and

3.

INSERT GMI’.

net.)

4.

Note: The start-up sequence gives the opportunity to

observe the test LEDs and buzzer are functioning
correctly.

Advertising