Southbend SE36 User Manual

Page 13

Advertising
background image

Installation & Operations Manual 1189331 Rev 0 (03/07) Page 9

SECTION 1

INSTALLATION

A. Inspect for Shipping Damage

All shipping containers should be examined for damage before and during unloading. This equipment was
carefully inspected and packaged at the factory. the freight carrier has assumed responsibility for its safe
transit and delivery. If equipment is received in damaged condition, either apparent or concealed, a claim
must be made with the delivering carrier.

1. Apparent Damage or Loss - If damage or loss is apparent it must be noted on the freight bill or express
receipt at the time of delivery, and must be signed by the carrier’s agent (driver). If this is not done , the
carrier may refuse the claim. The carrier will supply the necessary claim forms.

2. Concealed Damage or Loss - If damage or loss is NOT apparent until after equipment is unpacked, a
request for inspection of concealed damage must be made with the carrier within 15 days. The carrier will
make an inspection and will supply necessary claim forms. Be certain to retain all contents plus external and
internal packaging materials for inspection.

Advertising