Installation, Installing the drive(s) into the infostation, Drive preparation – StorCase Technology 14-Bay 4U SCSI Ultra160 User Manual

Page 6: Carrier preparation, Infostation installation

Advertising
background image

InfoStation 14-Bay Installation Guide - Rev. C00

StorCase Technology, Inc.

Installation

1

INFOSTATION INSTALLATION

CAUTION:

The InfoStation contains NO USER SERVICEABLE PARTS inside the unit.

Warranty is VOID if any of the modules inside the InfoStation are opened.

Refer ALL servicing to qualified service personnel!

Before removing any component from its packaging, discharge any

static electricity by touching a properly grounded metal object.

VHDCI connectors are easily damaged by improper handling. Visually

inspect each connector for bent contacts and carefully align prior to

insertion.

NOTES:

A #2 Phillips screwdriver will be required.

For user information, refer to the InfoStation User's Guide.

Installing the Drive(s) into the InfoStation

While performing the steps in this section, work on a soft surface to prevent excessive shock

to the drive(s) being installed. Also refer to the manufacturer's documentation provided with

the drive(s).

Drive Preparation

1.

Remove the drive from its protective packaging.

2.

SCSI Drive Termination - Disable SCSI termination from the drive. Refer to the

documentation provided by the drive manufacturer for the location of these termi-

nators or jumpers.
Refer to section "Termination of the SCSI Bus at the VHDCI Connectors" in the

InfoStation User's Guide for further information.

Carrier Preparation

The InfoStation is shipped in a container designed to provide protection and prevent damage

during shipment, as confirmed by the International Safe Transit Association (ISTA Procedure

1A).

The drive carriers are individually packed in a special foam insert within the InfoStation shipping

carton. Simply remove them from the foam insert when ready for use.

Advertising